If you're planning a new kitchen, one of the first questions you're likely to have is how much the entire project is going to cost.
The answer can vary considerably. A straightforward kitchen installation where the room is already prepared is very different from a full renovation involving removal of the existing kitchen, plumbing, electrics, plastering, flooring and other preparation works.
This guide explains some of the main costs Coventry homeowners should consider before starting a kitchen project.
How much should you budget for a kitchen renovation?
There isn't one fixed price for a kitchen renovation.
The overall cost will usually depend on three main areas:
The kitchen itself
Installation
Additional preparation and finishing works
Industry cost guides currently put a typical budget kitchen renovation in the UK at roughly £6,200–£16,800, while higher-specification and bespoke projects can cost considerably more.
Installation labour alone can also vary significantly depending on the size and complexity of the kitchen.
For this reason, it's important to understand exactly what is included when comparing quotes.
Kitchen installation vs a full kitchen renovation
A kitchen fitting quote may cover only the installation of the new cabinetry and appliances.
A full renovation may also involve:
Removing and disposing of the existing kitchen
Plumbing alterations
Electrical work
Plastering
Wall preparation
Flooring
Decorating
Appliance connections
Worktop installation or coordination
Making good after other trades
These additional works can make a significant difference to the final project cost.
A cheaper installation quote isn't necessarily cheaper overall if you then need to organise several other trades separately.
What affects the cost of a kitchen renovation in Coventry?
Kitchen size
A larger kitchen normally means more cabinets, worktop, flooring and labour.
The number of units alone can have a significant impact on both the supply and installation cost.
Kitchen specification
The choice of doors, cabinetry, internal storage, handles and accessories can move the price considerably.
A relatively simple kitchen using standard cabinetry will usually cost less than a highly customised design.
Worktops
Laminate worktops are generally more affordable, while quartz, granite and other solid surfaces increase the overall cost.
Stone worktops also normally require templating and a separate installation after the kitchen units have been fitted.
Appliances
Integrated refrigeration, ovens, dishwashers, wine coolers, boiling-water taps and other appliances can quickly increase the overall budget.
Some appliances may also require additional electrical or plumbing work.
Plumbing and electrics
Keeping your sink, appliances and sockets in similar locations can reduce the amount of alteration required.
Changing the kitchen layout may require additional plumbing or electrical works.
Preparation work
Once an old kitchen is removed, issues can sometimes become visible that weren't obvious beforehand.
Uneven walls, damaged plaster, old flooring or outdated services may need attention before the new kitchen can be installed properly.
What should a kitchen renovation quote include?
When comparing quotes, look beyond the headline figure.
Make sure you understand whether the price includes:
Removal of the existing kitchen
Kitchen installation
Plumbing
Electrical works
Plastering
Flooring
Decorating
Appliance installation
Sink and tap connections
Waste removal
Worktop fitting or coordination
Two quotes can look very different simply because one includes significantly more work than the other.
Can JPAK help if I haven't bought my kitchen yet?
Yes.
If you already have your kitchen designed or ordered, we can discuss the installation and any preparation works required.
If you haven't chosen your kitchen yet, JPAK Property Services can also help with design and sourcing through selected supplier trade accounts where available.
This allows the kitchen supply, installation and wider preparation works to be considered as one overall project rather than several separate jobs.
How long does a kitchen renovation take?
The timescale depends on the amount of work involved.
A straightforward installation into a prepared room may only require several days.
A full renovation involving removal, plumbing, electrics, plastering, flooring and installation will naturally take longer.
Industry guidance often suggests around two weeks for a typical kitchen installation, although more involved renovations can extend beyond this.
The best approach is to establish the required works before the project begins and create a realistic schedule around them.
Planning a kitchen renovation in Coventry?
JPAK Property Services coordinates kitchen projects across Coventry and surrounding areas, including installation and the preparation and finishing works required around the kitchen.
If you're planning a new kitchen, tell us a little about your project and we'll get back to you to discuss the next steps.